Результати пошуку
- Фільтрувати за фондом:
- Всі
- Патенти України на винаходи
- Патенти України на корисні моделі
- Патенти України на промислові зразки
- Патенти на винаходи зарубіжних країн
- Заявки на винаходи
- Свідоцтва на топографії ІМС
- Свідоцтва України на знаки для товарів та послуг
- Прийняті до розгляду заявки на знаки для товарів і послуг
- Кваліфіковані зазначення походження товарів (КЗПТ)
| № п/п |
Номер патенту |
Назва винаходу та фрагмент реферату | Дата публікації патента |
|---|---|---|---|
| 1 | JP10005385A |
BINDING FOR SNOW BOARD
PROBLEM TO BE SOLVED: To provide binding for snow board with which the fixed binding is hardly loosened, the leg parts of a rider are protected from impulse and a production of many kinds in small quantities can be dealt with as well. SOLUTION: Such binding 2 mounts boots at a central part on the surface side of snow board with suitable stance width or stand angle. Concerning binding 21, a bottom ... |
13.01.1998 |
| 2 | JP10005624A |
DECANTER CENTRIFUGE GENERATING CAKE LOW IN WATER CONTENT IN HIGH TREATMENT QUANTITY AND RELATED METHOD
PROBLEM TO BE SOLVED: To provide a decanter centrifugal separator having a structure for reducing the water content of a discharged cake while keeping relatively high cake treatment quantity, and provide a method for operating the same. SOLUTION: A bowl 12 rotatable around its longitudinal axial line 16 and having a cake discharge opening part 18 at one end thereof and having a liquid phase discha... |
13.01.1998 |
| 3 | JP10006790A |
TRANSMISSION OF TRACTOR
PROBLEM TO BE SOLVED: To store a shuttle transmission, both main and sub transmissions and a creep transmission, etc., in a car body without lengthening a wheel base. SOLUTION: A clutch housing 2 constituting the car body of a tractor is equipped with a first chamber 3 housing a main clutch 7 and a second member housing a shuttle transmission 8 and a main transmission 9 as installing them in front... |
13.01.1998 |
| 4 | JP10006791A |
TRANSMISSION OF TRACTOR
PROBLEM TO BE SOLVED: To secure a creep shaft without lengthening the wheel base of a tractor. SOLUTION: A clutch housing 2 constituting the car body of a tractor is combinedly provided with a first chamber 3 housing a main clutch 7 and a second chamber housing a main transmission 9, forming a rear opening 5 at a rear part of this second chamber 4. In this constitution, a sub transmission 10 and a... |
13.01.1998 |
| 5 | JP10006792A |
TRANSMISSION OF TRACTOR
PROBLEM TO BE SOLVED: To design the height and width of a car body compact in size even in the case where a shuttle transmission and a traveling main transmission are assembled in the same chamber. SOLUTION: This tractor's transmission is so constituted that a shuttle transmission 8 and a main transmission 9 both are installed in a traveling transmission system interlocking with an engine 1 via a ... |
13.01.1998 |
| 6 | JP10006793A |
HORIZONTAL DRIVING FORCE DISTRIBUTOR
PROBLEM TO BE SOLVED: To secure a compactification suited to a two drive vehicle with a transverse engine, and yet further excellent installability and assembleability in combination. SOLUTION: This device is composed of a capped front case 27 divided with a body case 25 of a horizontal driving force distributor into three parts, a wallike part 26 and a cupped rear case 28, while it forms two adja... |
13.01.1998 |
| 7 | JP10006794A |
TRACKLESS VEHICLE EQUIPPED WITH DOUBLE TIRES
PROBLEM TO BE SOLVED: To reduce a loss of driving force due to a rotational speed difference between both inner and outer wheels by using a set of double tires in order to lighten a load burden. SOLUTION: At both sides in the axial direction of a rigid axle 11, a differential distribution of power transmission takes place by a differential mechanism 12, and thereby a difference between both inner ... |
13.01.1998 |
| 8 | JP10006796A |
COMBINE
PROBLEM TO BE SOLVED: To improve sealing property of an engine setting site so as to easily simplifying an engine soundproof structure and to improve workability such as maintenance of a working hydraulic oil pump by providing the hydraulic oil pump on an input shaft from the engine of a counter case. SOLUTION: A working hydraulic oil pump 50 is attached to a counter case 41 serving also as a hydr... |
13.01.1998 |
| 9 | JP10006816A |
VARIABLE VALVE SYSTEM DEVICE OF INTERNAL COMBUSTION ENGINE FOR VEHICLE
PROBLEM TO BE SOLVED: To prevent the number of revolutions from exceeding a given value set according to valve lift characteristics even when the number of revolutions of an engine is rapidly increased occasioned by a gear shift. SOLUTION: An internal combustion engine 100 comprises a variable valve system mechanism 1 to change a valve working angle; and an automatic transmission 101. When a shift... |
13.01.1998 |
| 10 | JP10007114A |
CHAMBER STERILIZING METHOD IN PACKING MACHINE
PROBLEM TO BE SOLVED: To securely sterilize contact parts of rollers and a web in a chamber of a packing machine and securely fix a sterilizer in the chamber. SOLUTION: In a packing machine, a web W for packing container is guided and moved by rollers 6, 8, 9, 10, 11, 12, 13, 14, 15, 16 in a sterile chamber 1, the web W is formed into a cylindrical shape, the edge of the cylindrically formed web W... |
13.01.1998 |
| 11 | JP10008585A |
HORIZONTAL HEAT-COLLECTING DUCT
PROBLEM TO BE SOLVED: To ensure a flat section, to conduct the connection works of a duct easily, to improve operating efficiency on a field, to assemble the duct cylindrically and simply on the field and to prevent a bulky state because a folded state is required at the time of carrying-in. SOLUTION: Since the plates of a heat-insulating material are joined in a ridge duct 4 as a horizontal heat-... |
13.01.1998 |
| 12 | JP10008912A |
TURBINE BYPASS VALVE CONTROL DEVICE
PROBLEM TO BE SOLVED: To constantly maintain the rising rate of a load, by correcting a closing signal by the load signal of a steam turbine, in switching from steam bypass operation to steam turbine operation in a combined cycle plant by a turbine bypass program closing slignal. SOLUTION: In operating a plant, a high-pressure turbine bypass valve 1 is controlling main steam pressure, and at the p... |
13.01.1998 |
| 13 | JP10009348A |
FULL-AUTOMATIC CONTINUOUSLY VARIABLE TRANSMISSION WITH SPEED REDUCING AND INCREASING MECHANISM
PROBLEM TO BE SOLVED: To provide a full automatic continuously variable transmission of self-reverse drive type with sun gear, which makes speed reduction and increase steplessly by its own force and which well works in practise. SOLUTION: A rotational input is made by a rotational input member 2 having a driving gear 3 centering on a chassis fixing shaft 1, and a plurality of shift gears 4 are su... |
13.01.1998 |
| 14 | JP10009369A |
GEAR TRANSMISSION
PROBLEM TO BE SOLVED: To provide a large capacity transmission using bevel gears which operates with a high peripheral linear velocity and can cope with the high speed and large capacity requirements of a draining device. SOLUTION: This transmission concerned is used in a high depth underground draining device or the like, and is embodied in such a configuration that the power of a prime mover tra... |
13.01.1998 |
| 15 | BR9601428A |
MÉTODO PARA CRIAR BANCO DE DADOS DE CONSTANTES DE CURA OTIMIZAR A CURA E GARANTIR A QUALIDADE DE COMPOSTOS DE BORRACHA SUSCETÍVEIS A REVERSÃO E RESPECTIVA PRENSA DE CURA
A database of reversion cure constants is provided by measuring a physical property of a rubber formulation at two different temperatures as a function of time, calculating a set of cure constants for the rubber formulation which account for reversion, and storing the constants for later use either to optimize cure for a given process or of a given compound, or to assure quality of a raw compound.... |
13.01.1998 |
| 16 | US5708427A |
VEHICLE IN-LANE POSITIONAL INDICATION/CONTROL BY PHASE DETECTION OF RF SIGNALS INDUCED IN COMPLETELY-PASSIVE RESONANT-LOOP CIRCUITS BURIED ALONG A ROAD LANE
A vehicle's position is determined, normally within +/-0.37 inches, relative to an imaginary center line of a road lane along which are buried, normally about every 13 feet, completely passive resonant circuits, normally each a simple, inexpensive and durable 1-turn 11.5'' diameter shallow loop of #12 copper wire in series with a proper capacitor, nominally 10 nanofarads, for resonance. In-lane po... |
13.01.1998 |
| 17 | US5708689A |
CIRCUIT FOR DETECTING A SYNCHRONIZATION BYTE OF A TRANSPORT STREAM
A circuit for detecting a synchronization byte when a decoder of a MPEG 2 system performs a parsing on a transport stream. The circuit includes a shift register for receiving a transport packet, 1 byte at a time whenever a clock signal is received, and for outputting the packet to a first comparing device which compares a hexadecimal value 47 (OX47) and the value received from the shift register. ... |
13.01.1998 |
| 18 | US5708776A |
AUTOMATIC RECOVERY FOR NETWORK APPLIANCES
An automatic recovery system for a network appliance features a watchdog processor that monitors operation of the appliance and initiates reboot as necessary. A primary and a secondary boot partition are provided in the system, in some embodiments on the same mass storage device, and in other embodiments on a different mass storage device. In the event reboot is unsuccessful from the primary boot ... |
13.01.1998 |
| 19 | JP10005855A |
MANUFACTURE OF BUTT-WELDED STEEL TUBE, AND ITS EQUIPMENT
PROBLEM TO BE SOLVED: To improve the yield by treating a skelp which is present in a heating zone of a heating furnace without any loss as much as possible while the size is changed or the work is interrupted in a manufacturing process of a butt- welded steel tube. SOLUTION: A flying cutting machine 21 is provided on the upstream side of a high temperature heating zone 12 of a heating furnace, the... |
13.01.1998 |
| 20 | JP10005856A |
MANUFACTURE OF STEEL TUBE
PROBLEM TO BE SOLVED: To obtain a steel tube with a superior seam and surface quality by preheating a formed open tube, successively preheating and heating the edge through induction heating, and then pressure-welding by a squeeze roll. SOLUTION: A steel strip 1 is preheated by a preheating furnace 2 as necessary, and formed continuously by a group of forming rolls 3 into an open tube 7. This open... |
13.01.1998 |